ProgrammesGTL & Hydrogen

Local gas resources. A defined route to useful fuel.

Epiphany’s source materials describe modular gas-conversion routes for synthetic liquid fuels and a separate hydrogen configuration. CM’s proposed role is to evaluate treatment of compatible finished GTL liquid fuel after conversion, finishing and quality checks.

Development pathway

Technology reference
Epiphany Energy materials
CM focus
Finished liquid-fuel treatment
Hydrogen
A separate process configuration

CM’s proposed integration begins with compatible finished liquid fuel, after conversion, finishing and quality checks.

Start with the gas resource

A useful GTL project starts with a specific gas stream and a defined need for its output. Gas composition, availability, existing uses and the intended customer shape the engineering case.

Surplus LNG boil-off or another suitable methane-rich stream may warrant assessment. Contaminants, preparation requirements, logistics and site demand must be considered together. A reference process configuration provides context; the actual gas analysis establishes the project basis.

The route from gas to liquid fuel

Epiphany’s source materials describe a liquid-fuel pathway through gas preparation, synthesis gas, Fischer–Tropsch conversion and product finishing. Each stage has a distinct purpose.

  • Prepare the feed gas and establish contaminant-removal and utility requirements.
  • Produce synthesis gas for the selected liquid-fuel process configuration.
  • Convert synthesis gas into hydrocarbons through Fischer–Tropsch synthesis.
  • Finish the liquid product and confirm its specification for the intended application.

Where CM fits

CM proposes evaluating treatment of compatible finished GTL liquid fuel after conversion and finishing. That assessment starts with the actual fuel grade, its existing additive package, the intended equipment and the agreed treatment rate.

An operating trial would define the comparison, measurement method and acceptance criteria before treatment. The reviewed source materials do not establish a completed combined GTL–CM performance trial. The practical next step is an application-specific evaluation.

Hydrogen has its own project basis

The reference material also describes a separate hydrogen configuration. Feedstock, site interfaces, utilities, offtake and acceptance testing need to be defined for the chosen route.

Reference capacities retain their original feed and process basis. Liquid-fuel and hydrogen outputs should not be combined into a simultaneous maximum for one configuration. CM’s proposed FCS treatment of finished liquid fuel is separate from hydrogen production.

From an opportunity to a project brief

A useful project brief connects the resource, process route and intended output with the site and customer. Begin with the information already available, then identify the engineering work still needed.

  • Gas composition, available flow and existing or planned uses.
  • Chosen product route and the required fuel or hydrogen specification.
  • Site conditions, utilities, logistics and process interfaces.
  • Intended customer, offtake requirements and acceptance testing.
  • For a liquid-fuel treatment trial: fuel identity, equipment, operating duty and measurement plan.

Continue exploring

FCS Fuel Treatment

Technical Evaluation & Pilot Programme

Global Technology Hub

This website uses strictly necessary cookies to enable the website to function, namely to secure our website and to save certain preferences and repeat visits, including recording your cookies preferences.

If you agree, we would also like to use non-essential cookies to enable us to observe traffic levels to the website which allows us to understand interaction with the website and helps us to improve the website and our services.

To learn more about this, visit our Cookie Policy. You may consent or decline to the use of non-essential cookies by clicking “Accept Cookies” or “Decline Cookies” below.

Contact CM